Jim:
Attempting to catch up after the conference last week. First up, please find the attached RFI 4. I have included both a PDF and the word document, for ease in replying. Please realize that there are a lot of items and a short turn around date on some, but we hope (and think) there is not a lot of time required by the City in preparing responses.
I will be attending to our design review meeting minutes and invoicing (which will describe the shifted contract fees associated with decreased BCF, increased permitting and MBR system procurement, etc.) tomorrow.
How close is the City to issuing a consolidated set of 60% review comments?
Chris
<<RFI No 4 final.doc>> <<RFI No 4 final.pdf>>
___________________________
Kennedy/Jenks
Consultants
www.kennedyjenks.com
Christopher W. Kelsey, P.E.
32001 32nd Ave. South, Suite 100
Federal Way, WA
98001
ChrisKelsey@KennedyJenks.com
( 253-874-0555 | Direct:
253-942-3467
Cell:
253-670-5402 | Fax: 253-952-3435