All:
Please find attached below our decision items checklist for the BCF and WWTP, which we would like to use to aid in the review of the Schematic Design package:
<<10% Design Workshop BCF Checklist.doc>> <<10% Design Workshop WWTP Checklist.doc>>
Attached below is a PDF of the QC Memo, please refer to the Action Items section for the list we would like to use to aid in the review of the Draft MBR System Procurement package:
<<QC_Memo_MBR_Procure_Docs.pdf>>
___________________________
Kennedy/Jenks
Consultants
www.kennedyjenks.com
Christopher W. Kelsey, P.E.
32001 32nd Ave. South, Suite 100
Federal Way, WA
98001
ChrisKelsey@KennedyJenks.com
( 253-874-0555 | Direct:
253-942-3467
Cell:
253-670-5402 | Fax: 253-952-3435